We worked until 11 PM again on Wednesday. We finished the electrical, installed a third brake light, installed passenger side roll cage padding, removed the tranny from the parts car, installed screening inside the air dam, other small stuff, ordered parts from OGTS, and now the car is just about ready for it's first date with Thunderhill on Friday. It still needs:
- To have the drivers-side floor repaired (Clint, Evil Genius Racing)
- Weld on a bracket for the instrument panel (Clint, EGR)
- Replace a seal on the tranny (us)
- Install oil temperature sensor (Clint, EGR)
- Install the windshield (us)
- Install mirrors (us)
- Tuning (the fine folks at EGR)
- Finish installing the roll cage padding (us)
Tonight we finished assembling the new, professional-looking (non-LeMony) gauge/switch panel. Don't mind the mess of wires behind it. We'll get that under control soon. Also, we don't have the fan, cool-seat, headlights, etc in yet.
The instrument panel was made by Front Panel Express. |
Messy wiring, but it will get cleaned up. |
We got the floor repaired earlier today, got the gauge panel mounted, installed a harness, installed the windshield, succeeded in getting the shifter seal replaced, but no tuning. Not enough time.
If we survive the track day then all that is left is primarily cosmetic and fine tuning/adjusting, and driving it around the neighborhood late at night.
No comments:
Post a Comment